At the construction site of the Udokan mining and metallurgical plant, the construction of the building of the Materials and Supply Base has been completed.
According to the General Director of Baikal Mining Company, Mr. German Mironov, at present all external works at the facility have been completed, the installation of utilities and equipment is being carried out in the building, as well as a complex of finishing works.
The M&S Base is designed to store a wide range of material and technical assets (spare parts, units, consumables, fuels and lubricants, etc.). Its building performs the functions of an auxiliary facility that ensures the smooth operation of the facilities of the process plant, as well as the needs of the service center, energy and mining and transport areas.
By the end of November, the installation of water supply, power supply, electric lighting, heating and ventilation systems for the building will have been completed. The shelving shall be installed in the premises.
Also, by the end of November, it is planned to complete works on the installation and connection of external MEP utilities.